Skip to content

From Packaging to Batteries: How Industry Is Building Circularity Into the Loop

Something Powerful

Tell The Reader More

The headline and subheader tells us what you're offering, and the form header closes the deal. Over here you can explain why your offer is so great it's worth filling out a form for.

Remember:

  • Bullets are great
  • For spelling out benefits and
  • Turning visitors into leads.

 

As pressures rise from emissions targets, material scarcity and consumer demand, industry is beginning to embed circular systems. Not as optional extras, but as operational foundations. Below illustrate how packaging, batteries and regulation converge into a commercial pivot toward sustainable resilience.

Packaging Recycling: Scaling Up with Tech & Policy

Chemical recycling, AI-based sorting, and hydrothermal treatments are evolving from lab-scale to logistics-scale, ready to reshape packaging waste. Forecasts predict the global recycling sector will grow from USD 33.8 billion in 2025 to USD 53 billion by 2035. Expanded producer responsibility (EPR) schemes are providing regulatory tailwinds, ensuring recyclability becomes a feature of design rather than an afterthought. These innovations can transform packaging from disposable to reusable. 

Germany’s €73 Million Bet on Battery Circularity

In Lower Saxony, the Technical University of Braunschweig is constructing a €73 million centre to research battery and fuel cell circularity. Covering design, use, recycling and lifecycle reuse, the facility represents a national-level commitment to sustainable energy storage systems. Embedding circularity within research infrastructure is an essential step in closing resource loops — and an enviable strategic signal for industrial policy. 

Digital Product Passports: Transparency Meets Design

Europe’s Ecodesign for Sustainable Products Regulation (ESPR) Working Plan introduces Digital Product Passports (DPPs) as mandatory by 2026 for tech goods and potentially beyond. DPPs will detail manufacturing materials, repair data, and recyclability. Companies should begin mapping metadata systems now, testing pilots, and exploring QR‑based product tracking. The result: traceable products with built‑in circular accountability. 

From packaging to batteries: A blueprint you can copy

Packaging: Pilots to production

Objective: Design packaging that is easy to sort, easy to recycle, and commercially viable.

What to do first (weeks 1–4)

  • Build a bill of materials for your top ten packs by volume. Identify inks, adhesives, closures and layers.

  • Score each pack against three rules: mono-material where possible, no “problematic” coatings, and clear on-pack guidance for disposal.

  • Choose one SKU for a fast pilot with a resin or board partner and a recycler. Agree target outcomes: recyclability claim, percent recycled content, cost delta, and line speed impact.

Scale it (months 2–6)

  • Run a factory trial and record reject rates, energy use and line speed before and after the change.

  • Lock in offtake with a recycler or converter so recovered material has a guaranteed buyer.

  • Update procurement specs to prefer certified recycled content and mono-material designs. Bake these criteria into supplier scorecards.

Make it stick (months 6–12)

  • Roll the new spec across adjacent SKUs once quality and cost are stable.

  • Standardise artwork rules for disposal symbols and QR links to local recycling guidance.

  • Publish a simple dashboard: recycled content, recyclability by weight, packaging cost per unit, reject rates.

Typical pitfalls to avoid

  • Switching materials without securing end-market offtake.

  • Treating artwork and consumer instructions as an afterthought.

  • Testing under ideal conditions only; measure performance on your fastest line.

Batteries: Design for return, reuse, and recovery

Objective: create a circular route for batteries and battery-containing products that is safe, legal and economical.

What to do first (weeks 1–4)

  • Map battery types, quantities and locations across products, service returns and warranty streams.

  • Define safe storage and handling rules with HSE and insurer input. Train the teams who touch returns.

  • Decide your preferred pathway for each battery type: refurbishment for second life, direct material recovery, or both.

Build capability (months 2–6)

  • Set up take-back with logistics partners. Use serialised IDs so each battery can be traced from return to outcome.

  • Run a small second-life trial for stationary storage if your sites have peak loads or backup needs. Compare the business case against new storage.

  • For direct recycling, agree pre-treatment standards and documentation with a certified recycler.

Scale and govern (months 6–12)

  • Add battery circularity metrics to management reporting: collection rate, percentage second life, percentage recovered to battery-grade, incidents per thousand handled.

  • Put offtake or service agreements in place so partners have confidence to invest in capacity.

  • Align design teams on future battery formats that simplify removal, testing and reuse.

Pitfalls to avoid

  • No serialisation, which kills traceability and makes compliance hard.

  • Treating second life as “free”. It needs diagnostics, warranties and clear duty of care.

Digital Product Passports: get data ready now

Objective: capture the product data you will need for DPPs and use it to cut waste and cost today.

What to do first (weeks 1–4)

  • Pick one category and draft a minimal data model: materials, recycled content, spare parts, repair steps, energy use and end-of-life options.

  • Map where each field lives today: ERP, PLM, supplier PDFs, service manuals, or nowhere.

  • Choose a simple identifier (QR or data matrix) that can be printed at scale.

Build and test (months 2–6)

  • Stand up a small data store for the passport fields and write a procedure for supplier submissions. Keep formats boring: CSV or JSON are fine.

  • Print codes on a pilot batch and test the scan journey with customers, service teams and recyclers. Remove steps that slow people down.

  • Agree governance: who owns each field, who approves changes, how long data persists.

Scale and integrate (months 6–12)

  • Automate population of passport data from PLM and ERP where possible.

  • Link DPP data to warranty and returns so you can see failure patterns by material or supplier.

  • Share a subset of data with recyclers to improve sorting and recovery yields.

Pitfalls to avoid

  • Collecting everything. Start with data that drives an operational decision.

  • Building a beautiful front end and neglecting supplier data quality.

A joined-up operating model

Circularity crosses functions. Set up a small, empowered team that reports to the COO or equivalent and owns these levers:

  • Standards: packaging design rules, battery handling SOPs, DPP data schema.

  • Suppliers: pre-qualified list for recycled materials, recyclers, and reverse logistics.

  • Investment: a ring-fenced budget for pilots with a clear gate to scale.

  • Commercials: template contracts that include offtake, minimum recycled content, and data sharing.

  • Measurement: one page per month with five numbers: recycled content, recyclability rate, battery collection rate, second-life share, and verified emissions saved.

Timeline

Days 1–30

  1. Choose one packaging SKU, one battery stream, and one product line for a passport pilot.

  2. Name accountable owners and agree targets and exit criteria.

  3. Book factory time, recycler time and a weekly stand-up.

Days 31–90

  1. Run the packaging trial; log yield, speed, cost, and consumer testing.

  2. Launch battery take-back on one site; complete first safe shipments to partners.

  3. Print passports on the selected product and test scans with internal teams and a small customer cohort.

Months 4–12

  1. Scale the packaging spec across the family once KPIs are stable.

  2. Decide the split between second life and direct recycling for batteries; sign longer term contracts.

  3. Automate passport data flows and expand to a second category.

  4. Publish quarterly numbers and what you learned; retire what did not work.

Measuring success

  • Financial: packaging cost per unit net of waste; avoided duty or levy; storage or peak-shaving savings from second-life batteries; warranty cost reduction from better product data.

  • Operational: throughput versus baseline; reject rates; safe handling incidents; time to retrieve product data.

  • Environmental: recycled content by weight; verified recyclability; battery recovery to battery-grade; emissions avoided through material substitution and energy management.

  • Customer: return rates for take-back schemes; scan rates on passports; satisfaction with repair or refurbishment options.

Common blockers 

  • “We do not have the data.” Start with a thin slice and only the fields that change decisions. Add more once value is proven.

  • “Suppliers will not engage.” Make the new spec a condition of business and offer a fair transition timeline. Share your test results.

  • “The business case is unclear.” Put waste, rejects, downtime, levies and risk into the model, not just material price.

  • “Teams are already busy.” Replace something. Retire low value reporting or a legacy pilot when you start this work.

Conclusion

The success stories are not magic. They are the result of simple rules applied with discipline: design for recovery, make data visible, contract for circular outcomes, and measure the same few numbers every month.

Start narrow, move fast, scale what works. That is how circular manufacturing becomes an operating system rather than a side project!